Shell- Princess Flexible Reels
Core offloaded reels from a vessel using the 850 T Heavy Lift Crane and staged them on the dock. The scope of work included removing the packing from the end terminations and installing new lubricants, seals, orings and Handling Heads on each. The Handling Heads provide a means for the Flexible Pipes to be lifted […]