
Flexible Reel Loaded to Barge
Core Industries recently loaded a 90-ton flexible reel to barge for Oceaneering International Inc. The barge delivered the reel to Port Fourchon, La., where it
Core Industries recently loaded a 90-ton flexible reel to barge for Oceaneering International Inc. The barge delivered the reel to Port Fourchon, La., where it
Core Industries loaded approximately 43,000 MT of woodchips onto the M/V YILDIZLAR 2 earlier this month. Arriving to Core on trucks, the woodchips were shipped
Earlier this month, Core Fabrication, LLC (Core) successfully executed two projects for Shell Offshore, Inc. for the Mars A-Tension Leg Platform (TLP). The Top Tensioned
Core Industries recently offloaded PN3 reel, umbilical test piece and 20 crates from the M/V HAPPY RANGER. After the pieces were flushed, tested and lashing
The M/V CENTURY ROYAL recently loaded over 8,000 MT of woodchips at Core Industries. Arriving to Core on truck, the woodchips were loaded and transported
Using its 300 ton Liebherr crane, Core Industries recently discharged Shell Auger Drilling Riser joints, baskets and running equipment from the M/V BLIZZARD. The Shell