Shell URSA Drilling Riser
Core Industries recently loaded pipe for the URSA Drilling Riser onto the M/V DEER ISLAND. In addition to installing fairings and buoyancy modules on the pipe, Core cleaned and prepped the pipe for load out. The URSA Drilling Riser is located 130 miles southeast of New Orleans, La. Core’s shore-based service experience and proximity to […]
Offloading Pipe: Shell
In November 2022, the M/V NICKI CANDIES, arrived at Core Industries to offload Top Tension Riser pipe from the Mars Oil and Gas Field Project. Core supplied bolster frames and rigging to Shell for loading and transporting the pipe to the Core dock. Using the 275-ton Terex crane, the pipe was offloaded and stored where […]