
Loading Woodchips
Core Industries recently loaded 41,927 MT of woodchips onto the M/V YILDIZLAR 3. The woodchips arrived at Core on truck and were stored. Core used

Core Industries recently loaded 41,927 MT of woodchips onto the M/V YILDIZLAR 3. The woodchips arrived at Core on truck and were stored. Core used

Core Industries recently loaded a pump station onto the HOS CLAYMORE. Arriving from Norway, the pump station was transported to Chevron’s Jack/St. Malo project in

Core Industries recently loaded 22,454 MT of wood pellets onto the M/V STAR HANSA. Arriving on truck, the wood pellets were transferred to warehouse storage

Core Industries recently discharged 6,015 MT of perlite from the M/V GOLF. Arriving from Greece, the perlite was offloaded using Core’s grab bucket, hopper, and

A 113-ton reel from Chevron’s Jack/St. Malo deepwater project was offloaded from a crane barge to dock at Core Industries. The reel was relocated to

Core Industries recently loaded 32,390 MT of wood pellets onto the M/V NORSE ANTWERP. Arriving on truck, the wood pellets were stored in warehouses and