In March 2018, Hornbeck Offshore contracted Core Industries to assist and repair the heel pin area of their 250T knuckle boom crane on the HOS Warland. Two weeks after the Warland was complete, the HOS Woodland arrived for the same repairs. Core assisted in repairing and fixing the heel section of the vessels cranes. Core’s main role in this operation was using two of their own cranes, to lift the boom section of the vessels crane for 8 consecutive days while the repairs could be made. Hornbeck Offshore chose Core for this project due to the good relationship, dock capacity and heavy lift capacity Core provides.