After a successful dredge ladder loadout in early November 2019, SPI/Mobile Pulley Works contracted Core to utilize and load out an A-frame onto a barge for delivery to their client. Berard transported three A-frame parts from SPI/Mobile Pulley Works to Core’s private port facility. Core worked alongside, providing crane services and other critical assistance, MPW to utilize a 100’ X 100’ area on the main dock to assemble the three pieces of the A-frame. The two leg pieces weighed approximately 53,000 lbs each with the main A-frame cross member piece weighing approximately 132,000 lbs. Core assisted with resources to stage and turn the three pieces into position for assembly and then provided load out the final completed unit onto a barge.