Loading Woodchips
![](https://coreindustries.com/wp-content/uploads/2023/05/DSCN0337-1024x768.jpg)
Core Industries recently loaded 35,153 metric tons of woodchips onto the M/V KAAN AKSOY. Delivered to Core on truck, the woodchips came from Alabama and Mississippi and were shipped to Turkey. Core used its reclaims, conveyors, traveling ship loader with jet Slinger and two Wagner chip dozers to complete the job.
Offloading Perlite: M/V EVER BRILLIANT
![](https://coreindustries.com/wp-content/uploads/2023/04/DSCN0303-768x1024.jpg)
Core offloaded 3,500 metric tons of Perlite off of the M/V EVER BRILLIANT. Imported from Greece, the product was loaded directly to truck and transported to warehouse for storage and subsequent delivery to a customer in Pensacola, Fla. Core Industries used its grabs, front end loader and vessel cranes to complete the job.
Flexible Reel Loaded to Barge
![](https://coreindustries.com/wp-content/uploads/2023/03/Flex-reel-for-Shell-Powernap-phase2.3.3.23-945x1024.jpg)
Core Industries recently loaded a 90-ton flexible reel to barge for Oceaneering International Inc. The barge delivered the reel to Port Fourchon, La., where it will be loaded to a construction vessel to be installed in the Shell PowerNap Phase 2 project in the Gulf of Mexico. The reel has been stored at Core Industries […]
Loading Woodchips
![](https://coreindustries.com/wp-content/uploads/2023/03/DSCN0247-1024x685.jpg)
Core Industries loaded approximately 43,000 MT of woodchips onto the M/V YILDIZLAR 2 earlier this month. Arriving to Core on trucks, the woodchips were shipped to Turkey. Core used its two Wagner Woodchip Carrydozers to feed the woodchips to the reclaim system. From there, conveyors transported the woodchips to the ship loader which utilizes a […]
Shell Mars A-Tension Leg Platform
![](https://coreindustries.com/wp-content/uploads/2023/02/Picture3-1024x666.jpg)
Earlier this month, Core Fabrication, LLC (Core) successfully executed two projects for Shell Offshore, Inc. for the Mars A-Tension Leg Platform (TLP). The Top Tensioned Riser (TTR) for slot A-10 on the Mars A TLP was refurbished at Core to extend the life of the TTR string. Refurbishment and life extension of a TTR string […]
Umbilical Reel Handling
![](https://coreindustries.com/wp-content/uploads/2023/02/Deep-Blue-5.jpg)
Core Industries recently offloaded PN3 reel, umbilical test piece and 20 crates from the M/V HAPPY RANGER. After the pieces were flushed, tested and lashing stars were installed, the pieces were loaded onto the M/V DEEP BLUE to be installed in the Gulf of Mexico. Core Industries used its heavy lift crane, forklift and personnel […]
Loading Woodchips
![](https://coreindustries.com/wp-content/uploads/2023/01/DSCN0055-787x1024.jpg)
The M/V CENTURY ROYAL recently loaded over 8,000 MT of woodchips at Core Industries. Arriving to Core on truck, the woodchips were loaded and transported to Mexico. Core Industries personnel, Woodchip Carrydozers, conveyor system, ship loader and jet slinger were all used to complete the job. Core Industries operates one of the world’s largest bulk […]
Discharging Coral Calcium
![](https://coreindustries.com/wp-content/uploads/2023/01/core-calcium.12.24.22.5-1024x768.jpg)
On December 26, 2022, the M/V BAHAMA SPIRIT discharged around 9,000 tons of coral calcium at Core Industries. Once offloaded, the coral calcium rock was loaded to truck and taken to the Core Calcium plant. It was mixed with oyster shells and fed into the plant where it was dried, crushed, screened and bagged. The […]
Loading Woodchips
![](https://coreindustries.com/wp-content/uploads/2022/12/Core-Industries_2022-12-09-8-1024x682.jpg)
Core Industries loaded 34,424 MT of woodchips onto the M/V WECO HOLLI in December 2022. Arriving to Core on trucks, the woodchips were shipped to Turkey. Core used its two Wagner Woodchip Carrydozers to feed the woodchips to the reclaim system. From there, conveyors transported the woodchips to the ship loader which utilizes a Jet […]
Shell URSA Drilling Riser
![](https://coreindustries.com/wp-content/uploads/2022/11/20221124_130701-1024x768.jpg)
Core Industries recently loaded pipe for the URSA Drilling Riser onto the M/V DEER ISLAND. In addition to installing fairings and buoyancy modules on the pipe, Core cleaned and prepped the pipe for load out. The URSA Drilling Riser is located 130 miles southeast of New Orleans, La. Core’s shore-based service experience and proximity to […]