Seven Vega Demobilization
Core discharged project cargo from Chevron’s Jack/St. Malo deep water project from the SEVEN VEGA. Core provided rigging for the vessel’s crane, moving all equipment used offshore to storage and load out to trucks. The Jack/St. Malo deep water project is in the Gulf of Mexico. Core Industries has served as a base of operations […]
Seven Artic – Heavy Lift
Core used its 600-ton heavy lift crane to discharge four flexible empty reels from the SEVEN ARTIC to long-term storage. The reels were used in BP’s Mad Dog II project in the Gulf of Mexico. On the same visit, Core assisted the SEVEN ARTIC to prepare for the Shell Vito Project. Shell’s Vito deep water […]
Offloading Pipe: Harvey Energy
The Offshore Vessel (OSV) HARVEY ENERGY discharged the Shell Auger deepwater platform for a complete refurbishment at Core Industries. Over a two-month period, Core completely disassembled, cleaned, serviced and prepped the riser for load out before sending it back to the rig on time.
Mitiq Reels: Chevron
Core offloaded 2 TFMC reels from the vessel Mitiq, using our 660 ton heavy lift crane for Chevron in February 2022. With direct access to the Gulf of Mexico, our port facility, storage capacity and equipment capabilities are best in class for global clients working in oil and gas services.
SS7 Oceanic Heavy Lift
Using our 660-ton crane, Core loaded 4 flexibles and reels to the Seven Oceanic to be installed in the Gulf Of Mexico for the Murphy’s King Quay project. Our Team at Core is willing and ready to help you with all your industrial and shore based needs. Core offers a full suite of services and […]
DDI Mad Dog Transpool
As part of the Mad Dog 2 campaign, Core supported DDI with heavy lift while they transpooled 4 umbilical reels to their carousel. Core provided heavy lift on each reel to and from the Reel Drive System. As well as walking each UTA to and from the carousel for DDI to re-tension the product onto […]
Woodland HL Oceaneering
Core assisted Oceaneering in mobilizing the vessel, Woodland, with reel drive towers and a Shell flexible heavy lift for installation in the Gulf of Mexico. Core Industries has served as a base of operations for many oil field clients. Our port’s facilities are used to store, mobilize, and demobilize specific project equipment to and from […]
August 2021- SS7 Seven Artic 5 Heavy Lift Reels
For the Shell Colibri Project, the Seven Seas transpooled two large umbilicals from a barge mounted carousel, to their below deck carousel at the Core main dock. Core then loaded 5 reels on deck for installation offshore. After the transpooling was finished, Core dismantled the carousel from the barge and stored for Deep Down Inc. […]
Umbilical Transpool- Shell Colibri
Late June 2021, 3 flexible flowline reels were delivered to Core Industries from the BBC Happy Dragon for the Shell Colibri project in Trinidad. In July 2021 2 umbilical reels were delivered to Core via barge. Core assisted in July 2021 demobilizing and mobilized of 307,000 feet of umbilical to trans pool into the SS7 […]
Umbilical Reel Heavy Lift and Storage for the Mad Dog 2
In June 2021 Nexans supplied 5 umbilical reels from Norway that were delivered to Core Industries for the Mad Dog 2 campaign. Core provided heavy lift capabilities for lifting the reels to storage and assisted in storing the reels dockside. These reels will be handed to SS7 and will be deployed with the Seven Arctic […]