Core Industries recently loaded a 90-ton flexible reel to barge for Oceaneering International Inc. The barge delivered the reel to Port Fourchon, La., where it will be loaded to a construction vessel to be installed in the Shell PowerNap Phase 2 project in the Gulf of Mexico. The reel has been stored at Core Industries after being discharged from the HLV BBC ALBERTA in 2021. Core’s heavy lift cranes and personnel were used to receive the reel and load it out.