In November 2022, the M/V NICKI CANDIES, arrived at Core Industries to offload Top Tension Riser pipe from the Mars Oil and Gas Field Project.
Core supplied bolster frames and rigging to Shell for loading and transporting the pipe to the Core dock. Using the 275-ton Terex crane, the pipe was offloaded and stored where it will be cleaned and prepped by Core Industries.