In June 2020 Core Industries offloaded a 350 Metric Ton reel from a Derrick Barge and staged it in our dock storage area. Core loaded the reel onto the Seven Pacific for installation Subsea. We then unloaded the empty reel from the Seven Pacific. We will load the empty reel onto a barge for return to the Umbilical supplier’s facility. Core provided all necessary equipment and manpower to complete this job.