Early October 2020 four Barracuda reels arrived on a heavy lift vessel a few weeks before Technip’s Deep Star was scheduled to receive them on their deck for deployment in Trinidad. We offloaded the four reels (345mt, 345 mt, 336 mt, 290mt weights) loaded with flexibles and another 100 project packages and crates from the SAIMAAGRACHT and put them in temporary storage. The reels were loaded onto the Deep Star mid-October. The project was completed successfully using Core’s heavy lift and dock storage capacity.