In October 2018 Subsea 7 vessel, Seven Arctic, came to Core Industries private port facilities in Theodore, AL. While the Seven Artic was at port, Core demobilized several offshore project cargo items from the Murphy Dalmatian Project and then mobilized additional items onto the vessel for the Appomattox Project. These items were oil field related with both the Appomattox Project and the Murphy Dalmatian Project. The Appomattox project is Shell’s largest floating platform in the Gulf of Mexico while the Dalmatian South flow line is the deepest reeled pipe-in-pipe installed by Subsea 7 to date.