Hornbeck Offshore

In March 2018, Hornbeck Offshore contracted Core Industries to assist and repair the heel pin area of their 250T knuckle boom crane on the HOS Warland. Two weeks after the Warland was complete, the HOS Woodland arrived for the same repairs. Core assisted in repairing and fixing the heel section of the vessels cranes. Core’s […]

Heerema Aegir- March 2017

Heerema Marine Contractors’ (HMC) Aegir, is a deep water vessel that made its first port call in the U.S. on its maiden voyage from the Netherlands to CORE Industries private port facility, Theodore Industrial Port, in March 2014. The Aegir returned in March 2017 when HMC commissioned CORE industries for several facility services. Those services […]

Technip PDVSA Reel Load Out

Technip, who is a global leader in the oil and gas industry, hired CORE to load out 5 reels and many other items to an ocean going barge – San Miguel in July 2016 – August 2016. Due to Technip’s long term relationship and proximity to CORE industries, on July 18, 2016, CORE began working […]

Refurbishment of Technip’s Flagship Vessel — The Deep Blue

Technip is a global leader in oil and gas projects, technologies, systems and services. Technip partnered with Core to prep its flagship vessel, The Deep Blue, for refurbishment in July 2016. The Deep Blue is one of the most advanced pipelay and construction vessels in the subsea industry. As part of refurbishment, the Deep Blue […]

Mobilization of Heerema’s New DCV Aegir

In March 2014, Core served as a shore base for Hereema Marine Contractors and their newest vessel — the deepwater construction vessel (DCV) Aegir. This was the Aegir’s first port call in the U.S. on its maiden voyage from the Netherlands. It was designed for use on complex oil and gas infrastructure and pipeline projects […]

Hornbeck Offshore

In April 2016, the Core team brought the second of four MacGregor cranes associated with the Hornbeck MacGregor Crane Project out of long-term, off-berth storage. The crane was moved to the dock using 44 lines of self-propelled modular transporters (SPMTs). Core’s heavy-lift crane was used to load and install the 550-ton crane onto the Woodland HOS, […]

Subsea 7 Murphy Dalmation Project

Core also completed the heavy-lift services required for Subsea 7’s Murphy Dalmation Project in February 2016. Several umbilical reels were loaded onto Subsea 7 vessels for transport to an oil field in the Gulf of Mexico.

Subsea 7 Shell Stone Project

n February 2016, Core completed heavy-lift services for Subsea 7’s Shell Stone Project. Core used its heavy-lift capabilities to load umbilical reels stored off-berth onto Subsea 7 vessels for transport to Shell’s Stone Oil Field located in the Gulf of Mexico.

BP Umbilical Reel Unload

In December 2015, Core transferred a refurbished, 70-ton umbilical reel from off-berth storage to the dock. The reel was loaded onto a barge provided by BP to be used at one of their oil fields in the Gulf of Mexico.

Shell Stones Project

In November of 2015, Core started the work for Technip on the Shells Stones Project. The Shells Stones Project consisted of the offloading and storage of 80 Containers for Technip. This project required the use of Core’s 100t R/T crane as well as one of Core’s extensive supply of forklifts. The containers are stacked and […]