Decommissioning of Hero Demolition’s Safe Britannia
In July 2016, Hero Demolition Corporation hired Core for our deepwater port facility as well as operational capacity to execute a project involving their accommodation semisubmersible, the Safe Britannia. They docked the rig at our private port facility to remove and scrap the underwater thrusters, lowering the overall weight of the rig for total decommissioning at […]
Receiving and Long-Term Storage of Equipment for Subsea 7
Subsea 7 is a seabed-to-surface engineering, construction and services contractor for the offshore energy industry. In 2006, Subsea 7 contracted with Core for long-term shore-based services as well as storage, maintenance and mobilization of project equipment. In March 2016, Subsea 7 needed support to prepare the FMOG Holstein for three oilfield projects in the Gulf […]
Hornbeck Offshore
In April 2016, the Core team brought the second of four MacGregor cranes associated with the Hornbeck MacGregor Crane Project out of long-term, off-berth storage. The crane was moved to the dock using 44 lines of self-propelled modular transporters (SPMTs). Core’s heavy-lift crane was used to load and install the 550-ton crane onto the Woodland HOS, […]
Subsea 7 Murphy Dalmation Project
Core also completed the heavy-lift services required for Subsea 7’s Murphy Dalmation Project in February 2016. Several umbilical reels were loaded onto Subsea 7 vessels for transport to an oil field in the Gulf of Mexico.
Subsea 7 Shell Stone Project
n February 2016, Core completed heavy-lift services for Subsea 7’s Shell Stone Project. Core used its heavy-lift capabilities to load umbilical reels stored off-berth onto Subsea 7 vessels for transport to Shell’s Stone Oil Field located in the Gulf of Mexico.
BP Umbilical Reel Unload
In December 2015, Core transferred a refurbished, 70-ton umbilical reel from off-berth storage to the dock. The reel was loaded onto a barge provided by BP to be used at one of their oil fields in the Gulf of Mexico.
Shell Stones Project
In November of 2015, Core started the work for Technip on the Shells Stones Project. The Shells Stones Project consisted of the offloading and storage of 80 Containers for Technip. This project required the use of Core’s 100t R/T crane as well as one of Core’s extensive supply of forklifts. The containers are stacked and […]