Subsea 7 Murphy Dalmation Project

Core also completed the heavy-lift services required for Subsea 7’s Murphy Dalmation Project in February 2016. Several umbilical reels were loaded onto Subsea 7 vessels for transport to an oil field in the Gulf of Mexico.

Subsea 7 Shell Stone Project

n February 2016, Core completed heavy-lift services for Subsea 7’s Shell Stone Project. Core used its heavy-lift capabilities to load umbilical reels stored off-berth onto Subsea 7 vessels for transport to Shell’s Stone Oil Field located in the Gulf of Mexico.

BP Umbilical Reel Unload

In December 2015, Core transferred a refurbished, 70-ton umbilical reel from off-berth storage to the dock. The reel was loaded onto a barge provided by BP to be used at one of their oil fields in the Gulf of Mexico.

Shell Stones Project

In November of 2015, Core started the work for Technip on the Shells Stones Project. The Shells Stones Project consisted of the offloading and storage of 80 Containers for Technip. This project required the use of Core’s 100t R/T crane as well as one of Core’s extensive supply of forklifts. The containers are stacked and […]